Japan AI Data Center Power Consumption Market Summary
As per Transpire Insight Analysis, the Japan AI Data Center Power Consumption Market size is estimated at USD 912 Million in 2025 and is anticipated to reach USD 685.8 Million by 2033, growing at a CAGR of 20.68% from 2026 to 2033.
The Japan AI Data Center Power Consumption Market basically maps the electricity and energy backbone that’s needed so AI focused data centers stay on , properly, even when things get pretty intense in computing terms. You can see it backing large language models, computer vision systems, cloud AI services, and enterprise analytics. So stable power delivery, plus more efficient energy control, becomes kinda non optional for steady digital work across manufacturing, finance, healthcare, and also public services.
In the last three to five years, the market has been moving away from more standard server setups toward high density AI clusters that are loaded with advanced GPUs, and those GPUs use noticeably more electricity per rack. Then the rapid rollout of generative AI apps pushed this shift even faster, like it was already happening but it got sped up. At the same time, worries about national energy security and higher fuel costs, after global supply chain disruptions, made operators lean harder into efficiency and more resilient power arrangements.
Since electricity is turning into a bigger slice of operating costs, investments are drifting toward advanced cooling methods, intelligent power distribution systems, renewable energy tie ins, and energy optimisation approaches. That combo, more or less, is opening up new revenue channels across the whole data center value chain, not just the power side alone.
Japan AI Data Center Power Consumption Market Size & Forecast:
- Japan AI Data Center Power Consumption Market Size 2025: USD 912 Million
- Expected Market Value 2033: USD 685.8 Million
- Forecast CAGR: 20.68%
- Leading region in 2025: Kanto
- Fastest Growing region: Kyushu
- Key Profile: Schneider Electric, Vertiv Holdings, Eaton Corporation, ABB Ltd., Siemens AG, Mitsubishi Electric, Delta Electronics, Huawei Digital Power, Legrand, Cummins Inc., Hitachi Energy, Toshiba Energy Systems, Rittal GmbH, Johnson Controls, Nidec Corporation
Key Market Insights
- In 2025 Kanto was really sitting on most of the market , with something like a 58% share, mostly because Tokyo bunches together hyperscale campuses, plus enterprise cloud infrastructure and even the digital service providers kind of ecosystem.
- For Kyushu, it’s projected to be the fastest-growing region in the 2025–2033 window, pulled along by semiconductor spending, renewable energy initiatives, and brand new AI-ready data centre builds .
- On the product side, GPU-based AI computing infrastructure took the lead with close to 46% market share in 2025, which basically shows how many accelerated computing clusters are already being rolled out everywhere.
- Rack power distribution and electrical management systems stayed near the top too, ranking as the second-largest segment, as operators modernize older facilities for higher power densities, and more headroom.
- Liquid cooling infrastructure is expected to be the one with the fastest growth through 2033, allowing racks that can go beyond 50–100 kW to run smoothly and efficiently.
- When it comes to applications, hyperscale cloud data centres dominated , with around 54% share in 2025, helped by generative AI training plus inference workloads that keep expanding.
- Enterprise AI computing is forecast to become the fastest-growing application through 2033, as manufacturers, financial institutions, and healthcare providers push further with AI adoption.
- Looking at end users, cloud service providers were the leading group , holding nearly 57% market share in 2025, and taking the largest portion of AI infrastructure investments.
- And finally colocation operators are expected to grow quickest as an end-user category during 2025–2033, since enterprises often outsource AI infrastructure deployment rather than building everything in-house.
What are the Key Drivers, Restraints, and Opportunities in the Japan AI Data Center Power Consumption Market?
The expansion of artificial intelligence infrastructure seems like the main force moving the market forward. At the same time, the switch away from conventional cloud computing toward GPU-heavy AI training clusters, has pushed electricity consumption up per rack, pretty noticeably. Large language models and enterprise level AI applications essentially forced more high density server deployments. So operators went ahead and put money into advanced power distribution, liquid cooling, and energy optimisation systems. Even if it sounds obvious, this chain reaction directly lifts infrastructure spending and it also opens extra revenue paths across electrical equipment, cooling technologies, and energy management services.
Still, power availability stays the biggest structural obstacle. In dense cities where data centre demand is strongest, grid capacity constraints show up, plus utility connection timelines that can feel painfully long. New sites rarely just start quickly; they usually need multi-year planning, permitting, and transmission upgrades before any operations begin. And according to the Transpire Insight review of regional procurement announcements mixed with launch schedules, supply chain concentration is considered the prime execution risk. Because of that, facilities get commissioned later, customer onboarding gets pushed back, and near-term revenue gets muted, even while investment interest stays strong.
The next growth phase will be backed by renewable powered AI campuses and smart energy control platforms, that kind of thing. In Kyushu, the conditions look pretty favourable because renewable generation is still expanding, semiconductor investment keeps coming in, and the land costs are comparatively lower, yes. Battery energy storage too, along with microgrids , and AI driven power optimisation software will help stretch electricity utilisation and at the same time bring down the day to day operating costs. In practice, these tools let operators take on bigger AI workloads without a corresponding increase in energy losses. That, in turn should strengthen long-term profitability and speed up the deployment of the infrastructure faster.
What Has the Impact of Artificial Intelligence Been on the Japan AI Data Center Power Consumption Market?
Artificial intelligence is kinda changing how power is managed in modern Japanese AI data centre infrastructure, mostly by moving away from reactive upkeep and towards ongoing, continuous optimisation. In practice, AI platforms keep watching electricity loads, cooling behaviour, and how busy the servers are, all at the same time, then they automatically redistribute workloads to curb energy waste, but still keep service running like it should. On top of that, digital twins plus more intelligent building management systems are starting to coordinate electrical distribution, thermal management, and even backup power resources, with little or no manual babysitting.
Machine learning is also helping a lot with “look ahead” skills, because it can forecast electricity demand, spot equipment irregularities early, and plan maintenance before failures suddenly interrupt everything. Operators can lean on predictive analytics to fine-tune UPS performance, improve cooling efficiency , and check generator readiness sooner, so uptime goes up while maintenance costs drop, along with some of the unnecessary energy consumption. AI assisted control systems further help facilities deal with shifting GPU workloads in a more sensible way, which reduces operational friction and supports denser racks. Taken together, these advances improve power usage effectiveness and help meet corporate sustainability commitments. Still, full roll outs are not fully straightforward. Putting AI platforms into older sites often means major capital spending, specialised engineering know-how, and the availability of huge amounts of clean, reliable operational data. Many legacy setups do not have monitoring tools that play nicely together, so prediction quality stays limited, and large scale deployment can stall even if the benefits look obvious on paper.
Key Market Trends
- GPU racks above 50 kW kinda became “normal” after 2023, and it seems to have sped up the take-up of liquid cooling and those intelligent power distribution tools , sort of more everywhere than before.
- In Japan, operators kept expanding their renewable electricity buying across 2024–2026, which , at least in practice, lowered exposure to the wild swings of wholesale power pricing and also helped with sustainability milestones.
- Meanwhile, semiconductor investment in Kyushu moved infrastructure planning toward newer regional AI campuses, these setups having better long term electricity availability , and less uncertainty later on.
- NTT DATA along with the big cloud players increased their AI infrastructure spend, which nudged wider use of high capacity substations and more resilient electrical architectures.
- Data center developers started pushing modular facility designs faster after 2024, so deployments got shorter in time , and phased expansion of AI capacity became easier to manage.
- By 2025, advanced battery energy storage systems got a noticeable momentum , improving grid resilience and reducing the need for older style backup generation.
- AI powered energy management platforms rolled out across hyperscale sites too, letting teams do predictive electricity optimisation and cut down on wasted consumption.
- Liquid cooling vendors also leaned into more strategic partnerships with infrastructure providers between 2024 and 2026, which helped the next generation GPU deployments move along more smoothly.
- Utilities then strengthened grid modernisation programmes to handle the larger AI loads, so the whole cycle of investment in transmission upgrades and smarter energy management got encouraged.
- And overall, competitive strategies have started leaning more toward an integrated stack—power plus cooling plus software—rather than just standalone electrical equipment , changing how companies position themselves over the long run.
Japan AI Data Center Power Consumption Market Segmentation
By Infrastructure :
Power distribution units took the biggest slice, mainly because high density AI computing need stable and continuous electricity feeding, pretty much for each rack. UPS systems came in right behind that, since uninterrupted operations became pretty much non negotiable for hyperscale as well as enterprise sites running critical workloads. Cooling setups kept growing in importance too, because the higher rack power densities bring more heat, and so you need stronger thermal management. Battery energy storage systems kept expanding as well, with operators aiming for improved energy resilience and better power flexibility.
Infrastructure spending will keep moving toward integrated energy management, rather than standalone electrical gear. Transformers and switchgear will get upgrades to handle larger electrical loads and reinforce grid reliability. Backup generators still matter for emergency periods, while cleaner technologies slowly help lift efficiency. Overall, planning everything together should back long term operational stability and also reduce energy losses across today’s modern facilities.
By Data Center Type :
Hyperscale data centres ended up with the biggest chunk, mostly because cloud platforms and generative AI apps needed gigantic computing power, like, all the time. Enterprise data centres stayed in the second spot, since financial institutions, manufacturers, and healthcare organisations kept adding internal AI capabilities. Colocation facilities were also pulling in steady investment, they basically offer adaptable capacity without those huge upfront infrastructure expenses, which is kinda key. Meanwhile AI supercomputing centres kept growing, to back advanced research and these national innovation programmes.
Edge data centres are likely to grow quicker, since low-latency AI applications are moving nearer to end users and industrial workflows. Regional rollouts should ease the strain on older metropolitan sites, while still supporting distributed computing. When people plan capacity, they will have to juggle performance, electricity availability and day to day operating costs. And wider deployment across several facility types should help overall infrastructure resilience last longer.
By Power Source :
Grid electricity stayed as the main power option, mostly because the already in place transmission infrastructure kept backing the biggest part of the operating facilities. At the same time renewable energy uptake sped up a lot , as the operators started signing multi year electricity agreements to help with sustainability goals and to keep operating costs under control. Hybrid energy systems got more attention too, basically mixing renewable generation with battery storage, plus conventional electricity sources. And natural gas along with nuclear power kept on providing dependable baseload electricity whenever the resources were available.
Looking ahead, investment will concentrate on boosting energy security using a more varied mix of power sources. Battery storage will support the balancing act for the changing renewable generation, and it can also lower those peak electricity prices. Hybrid setups should make operations more resilient during stretches of heavy electricity demand. In the longer term planning, reliability will be reinforced for large AI computing campuses, so the power supply stays steady even when demand climbs.
By Application :
AI model training was kind of the biggest thing here, mostly because these advanced language models, and the whole foundation model approach, needed a lot of computing power for long stretches, you know, sustained processing periods. After that, cloud computing picked up speed, with pretty broad adoption across enterprise digital transformation programmes where teams needed scalable resources. Then there was high-performance computing which backed engineering work, pharmaceutical research, and advanced manufacturing simulations, all of them basically asking for serious processing capacity, lots of it. Meanwhile, enterprise AI applications kept growing across multiple industries, mostly via automation and analytical decision support, even when the workflows were a bit messy.
AI inference should grow faster, because once models are trained they end up deployed quite widely across everyday commercial operations and customer-facing services. Scientific computing will still keep playing a central role in research programmes, especially those that demand powerful computational resources. With higher workload diversity showing up more often, companies will likely invest more in flexible power infrastructure, plus advanced cooling technologies, and yeah, that’s not just hype. Operational efficiency will become a major competitive advantage for facility operators, it matters a lot.
By End User :
Cloud service providers keep holding the lead, mostly because big scale AI services need a steady ramp up of computing infrastructure, like constantly adding capacity. Tech companies then kept going too with heavy investment into AI development platforms and these kinds of digital offerings. BFSI organisations ramped up their infrastructure spend to sharpen fraud detection, risk analysis, and even automate customer service more, basically cleaner workflows. Government agencies plus healthcare providers followed along, expanding AI use to make public services better, and to improve medical research, with more precise results over time.
Manufacturing and telecommunications are also set to open extra avenues, especially via industrial automation, smart factory rollout and next generation network optimisation. When adoption gets wider across different end-user industries it tends to pull investment toward resilient electrical infrastructure and smarter energy management. On the regional side, expansion should help with more even capacity building outside the usual technology hubs. And if digital transformation keeps moving, it should reinforce long term market potential across a bunch of sectors, not just one corner.
What are the Key Use Cases Driving the Japan AI Data Center Power Consumption Market?
The biggest chunk of power consumption comes from AI model training inside hyperscale data centres, where cloud providers run high-performance GPU clusters for large language models and enterprise AI platforms. Ongoing processing , high rack density , and a never-ending style of uptime mean advanced power infrastructure is needed, so this becomes the main driver for electricity demand and for infrastructure spending in practice.
Enterprise AI and high-performance computing are also spreading through manufacturing, BFSI , healthcare, and tech organisations. In manufacturing, teams lean on AI for production optimisation and quality inspection, while financial institutions back fraud detection, along with risk modelling. Healthcare groups further roll out AI for medical imaging and clinical research, which then creates fresh needs for dependable computing capacity.
Newer use cases show up too, including sovereign AI infrastructure and scientific computing supported by national research programmes and collaborations between universities. At the same time, semiconductor design, plus digital twin development, bring in additional chances for specialised AI computing facilities. Over the forecast period, these workloads will nudge investment toward energy-efficient infrastructure as computing demands get more involved and harder to manage.
|
Report Metrics |
Details |
|
Market size value in 2025 |
USD 912 Million |
|
Market size value in 2026 |
USD 1.10 Million |
|
Revenue forecast in 2033 |
USD 685.8 Million |
|
Growth rate |
CAGR of 20.68% from 2026 to 2033 |
|
Base year |
2025 |
|
Historical data |
2021 - 2024 |
|
Forecast period |
2026 - 2033 |
|
Report coverage |
Revenue forecast, competitive landscape, growth factors, and trends |
|
Country scope |
Japan |
|
Key company profiled |
Schneider Electric, Vertiv Holdings, Eaton Corporation, ABB Ltd., Siemens AG, Mitsubishi Electric, Delta Electronics, Huawei Digital Power, Legrand, Cummins Inc., Hitachi Energy, Toshiba Energy Systems, Rittal GmbH, Johnson Controls, Nidec Corporation . |
|
Customization scope |
Free report customization (country, regional & segment scope). Avail customized purchase options to meet your exact research needs. |
|
Report Segmentation |
By Infrastructure (Power Distribution Units, UPS Systems, Backup Generators, Cooling Systems, Transformers, Switchgear, Battery Energy Storage Systems, Others); By Data Center Type (Hyperscale Data Centers, Enterprise Data Centers, Colocation Data Centers, Edge Data Centers, AI Supercomputing Centers, Others); By Power Source (Grid Electricity, Renewable Energy, Nuclear Power, Natural Gas, Hybrid Energy Systems, Others); By Application (AI Model Training, AI Inference, Cloud Computing, HPC Workloads, Enterprise AI, Scientific Computing, Others); By End User (Cloud Service Providers, Technology Companies, BFSI, Government, Healthcare, Telecommunications, Manufacturing, Others) |
Which Regions are Driving the Japan AI Data Center Power Consumption Market Growth?
The Kanto region makes up about 58% of national revenue, so it ends up being the main regional market, basically dominant. There’s a strong electricity backbone, advanced telecommunication networks, and even some supportive policies for digital transformation that keep pushing constant investment into AI-ready data centres. Tokyo, plus the surrounding prefectures, hosts hyperscale operators, cloud service providers, equipment suppliers, and technology firms, which together create this very interlinked infrastructure ecosystem. With enterprise digitalisation still rolling forward and with capacity upgrades ongoing, Kanto is likely to keep its leadership position over the whole forecast window.
The Kansai region has a different, kind of more “steady” growth angle, mainly because industrial activity stays balanced and infrastructure planning is dependable. Osaka and nearby prefectures see consistent economic momentum, utility networks that don’t wobble much, and diversified commercial spending, not this hyperscale concentration. Manufacturing is strong, financial services are active, and research institutions back up reliable adoption of AI computing infrastructure across many verticals. Because of that, the demand profile stays steadier, so regional revenue should remain stable while also lowering the risk tied to short-term swings in any one specific sector.
Kyushu is expected to see the most rapid expansion, since semiconductor spending plus renewable energy efforts have sped up infrastructure rollouts across the whole area. Lately, there has been more factory construction, plus better electricity network improvements and, yes , favourable land availability too which together make it easier to build new places aimed at AI. In particular, these conditions feel quite attractive for developers and for cloud operators who are looking for practical options. Also, operating costs tend to be lower than in the big metropolitan zones, so the investment case stays stronger. From 2026 through 2033, that momentum should open fresh chances for infrastructure suppliers, energy technology providers, and investors trying to grow beyond the already established data centre clusters.
Who are the Key Players in the Japan AI Data Center Power Consumption Market and How Do They Compete?
The competitive environment is still fairly consolidated, but there’s a kind of mix happening, where global infrastructure providers go head to head with domestic technology companies, and also with data centre operators. In practice, competition isn’t only about price, it’s more like technology innovation, energy efficiency, plus those integrated power management solutions that everyone talks about. At the same time, established suppliers keep broadening their product portfolios, and newer infrastructure investments open doors for firms that specialise in AI-ready electrical systems, advanced cooling, and more intelligent energy management.
Schneider Electric differentiates itself through integrated power distribution, monitoring software, and AI-ready energy management platforms which supposedly boost operational efficiency across the board. Vertiv leans more into high-density cooling, modular power infrastructure, and scalable deployment models, these help when you’re supporting advanced GPU clusters. Fujitsu, on the other hand, builds momentum by combining domestic digital infrastructure know-how with AI computing platforms, so enterprise customers can connect computing and energy management in a more unified, almost end-to-end way.
Mitsubishi Electric grows competitive strength via energy-efficient electrical equipment, along with advanced automation technologies made for high-capacity facilities. Equinix keeps adding regional data centre capacity, while also strengthening interconnection services, and that’s what tends to pull in enterprise and cloud customers who really care about low latency connectivity. NTT DATA blends digital transformation services with AI infrastructure investment, so customers can roll out computing resources while still getting managed operational support. Overall, these different plays mean each company competes with specialised capabilities, not just by offering pretty much the same service set , over and over.
Company List
- Schneider Electric
- Vertiv Holdings
- Eaton Corporation
- ABB Ltd.
- Siemens AG
- Mitsubishi Electric
- Delta Electronics
- Huawei Digital Power
- Legrand
- Cummins Inc.
- Hitachi Energy
- Toshiba Energy Systems
- Rittal GmbH
- Johnson Controls
- Nidec Corporation
Recent Development News
In April 2026, NTT DATA opened the AI-ready Keihanna OSK11 Data Center in Kyoto with 30 MW of IT capacity and dual power substations. The investment strengthens AI computing capacity in the Kansai region and increases demand for advanced power distribution, cooling, and energy management infrastructure. Source https://www.nttdata.com/
In April 2026, Microsoft announced a US$10 billion investment in Japan covering AI infrastructure, cybersecurity, and digital capacity expansion through 2029. The commitment will accelerate deployment of AI-capable data centres and drive long-term investment in electricity, cooling, and power infrastructure. Source https://news.microsoft.com/
What Strategic Insights Define the Future of the Japan AI Data Center Power Consumption Market?
The Japan AI Data Center Power Consumption Market is heading in a more distributed , high density type of AI setup, sort of powered by smart energy management, regional capacity building, and a tighter weave with renewable electricity. This trend is likely pushed by ongoing enterprise AI rollouts, bigger GPU footprints, and national level investment in digital infrastructure, not just a plain step up in data centre capacity. There’s also a quieter downside that people often ignore , it sits in regional power clustering , where grid capacity is a bit constrained and long utility connection timelines can slow down new sites even when the funding promises look strong.
On the upside , an interesting opening is taking shape in Kyushu. There , semiconductor expansion, renewable energy initiatives, and available land all combine, which makes conditions feel more favourable for next generation AI campuses and also for hybrid energy systems. Market players can really gain by locking in long term electricity deals, putting money into advanced cooling and battery storage, and building partnerships with regional utilities early on. If they do that, projects can reach operations sooner, and at the same time reduce exposure to later energy limitations plus those infrastructure traffic jams.
Japan AI Data Center Power Consumption Market Report Segmentation
By Infrastructure
- Power Distribution Units
- UPS Systems
- Backup Generators
- Cooling Systems
- Transformers
- Switchgear
- Battery Energy Storage Systems
By Data Center Type
- Hyperscale Data Centers
- Enterprise Data Centers
- Colocation Data Centers
- Edge Data Centers
- AI Supercomputing Centers
By Power Source
- Grid Electricity
- Renewable Energy
- Nuclear Power
- Natural Gas
- Hybrid Energy Systems
By Application
- AI Model Training
- AI Inference
- Cloud Computing
- HPC Workloads
- Enterprise AI
- Scientific Computing
By End User
- Cloud Service Providers
- Technology Companies
- BFSI
- Government
- Healthcare
- Telecommunications
- Manufacturing
Frequently Asked Questions
Find quick answers to common questions.
The Expected Japan AI Data Center Power Consumption Market size for the Market will be USD 685.8 Million in 2033.
Key segments for the Japan AI Data Center Power Consumption Market are By Infrastructure (Power Distribution Units, UPS Systems, Backup Generators, Cooling Systems, Transformers, Switchgear, Battery Energy Storage Systems, Others); By Data Center Type (Hyperscale Data Centers, Enterprise Data Centers, Colocation Data Centers, Edge Data Centers, AI Supercomputing Centers, Others); By Power Source (Grid Electricity, Renewable Energy, Nuclear Power, Natural Gas, Hybrid Energy Systems, Others); By Application (AI Model Training, AI Inference, Cloud Computing, HPC Workloads, Enterprise AI, Scientific Computing, Others); By End User (Cloud Service Providers, Technology Companies, BFSI, Government, Healthcare, Telecommunications, Manufacturing, Others).
Major Japan AI Data Center Power Consumption Market players are Schneider Electric, Vertiv Holdings, Eaton Corporation, ABB Ltd., Siemens AG, Mitsubishi Electric, Delta Electronics, Huawei Digital Power, Legrand, Cummins Inc., Hitachi Energy, Toshiba Energy Systems, Rittal GmbH, Johnson Controls, Nidec Corporation.
The current Japan AI Data Center Power Consumption Market size is USD 912 Million in 2025.
The Japan AI Data Center Power Consumption Market CAGR is 20.68% from 2026 to 2033.
- Schneider Electric
- Vertiv Holdings
- Eaton Corporation
- ABB Ltd.
- Siemens AG
- Mitsubishi Electric
- Delta Electronics
- Huawei Digital Power
- Legrand
- Cummins Inc.
- Hitachi Energy
- Toshiba Energy Systems
- Rittal GmbH
- Johnson Controls
- Nidec Corporation
Recently Published Reports
-
Apr 2026
Active Power Filter Market
Active Power Filter Market Size, Share & Analysis Report By Type (Shunt Active Power Filters, Series Active Power Filter, Hybrid Active Power Filter), By Application (Harmonics Mitigation, Reactive Power Compensation, Voltage Regulation, Power Factor Correction), By Phase (Single Phase, Three Phase), By End-User Industry (Manufacturing, Healthcare, Commercial, Automotive, Oil and Gas, Others), and Geography (North America, Europe, Asia-Pacific, Middle East and Africa, South and Central America), 2021 - 2031
-
Apr 2026
Electrical Transformer Market
Electrical Transformer Market Size, Share & Analysis Report By Core (Closed, Shell, and Berry), By Insulation (Gas, Oil, Solid, Air, and Other), By Phase (Single, and Three), By Rating (100 MVA to 500 MVA, 501 MVA to 800 MVA, and 801 MVA to 1200 MVA), and Geography (North America, Europe, Asia-Pacific, Middle East and Africa, South and Central America), 2021 – 2031
-
Apr 2026
Hydraulic Piston Pumps Market
Hydraulic Piston Pumps Market Size, Share & Analysis Report By Type (Axial Piston Pumps, Radial Piston Pumps), By Operating Pressure (Low Pressure, Medium Pressure, High Pressure), By Application (Construction, Mining, Agriculture, Automotive, Oil & Gas, Industrial Machinery, Others), By End-User (OEMs, Aftermarket), and Geography (North America, Europe, Asia-Pacific, Middle East and Africa, South and Central America), 2021 – 2031
-
Apr 2026
Laboratory Gas Generators Market
Laboratory Gas Generators Market Size, Share & Analysis Report By Product (Nitrogen Gas Generator, Hydrogen Gas Generator, Zero Air Gas Generator, Purge Gas Generator, TOC Gas Generators, Others), By Application (Gas Chromatography, Liquid Chromatography-mass Spectrometry (LC-MS), Gas Analyzers, Others), By End-user (Life Science, Chemical & Petrochemical, Food & Beverage, Others), and Geography (North America, Europe, Asia-Pacific, Middle East and Africa, South and Central America), 2021 – 2031